LOOSE CANNON

Share this post

User's avatar
LOOSE CANNON
Partial ICW Shutdown for Savannah Bridge Demolition Could Have Been Much Worse

Partial ICW Shutdown for Savannah Bridge Demolition Could Have Been Much Worse

Initial Channel Closure Plan Largely Failed To Consider or Warn Boating Public

Peter Swanson's avatar
Peter Swanson
Sep 30, 2023
∙ Paid
4

Share this post

User's avatar
LOOSE CANNON
Partial ICW Shutdown for Savannah Bridge Demolition Could Have Been Much Worse
3
1
Share
The first half of the new four-lane Island Expressway Bridge has been built. Now the old Causton Bluff is being demolished so the second span can be built.

Just in time for the southbound snowbird migration, transportation officials in Georgia are shutting down the Intracoastal Waterway for most of daylight and twilight hours, beginning Monday.

The old do…

Keep reading with a 7-day free trial

Subscribe to LOOSE CANNON to keep reading this post and get 7 days of free access to the full post archives.

Already a paid subscriber? Sign in
© 2025 Substack Inc
Privacy ∙ Terms ∙ Collection notice
Start writingGet the app
Substack is the home for great culture

Share